Madrid-Barajas Airport: the engineering behind its expansions

Written by ISP Integration editorial teamCategory: NEWS
Published:
Madrid-Barajas Airport: the engineering behind its expansions

Adolfo Suárez Madrid-Barajas Airport was created to replace the Getafe and Carabanchel airports.

Commercial operations began in 1933, with 378 flights and 2,873 passengers carried.

Industrial revolutions over the years forced the airport to undergo successive refurbishments, the first of which took place in 1944, consisting of paving the 1,400-metre runway.

From that year on, the number of passengers passing through the airport kept rising, reaching half a million passengers in the 1950s and continuing to grow in the years that followed. This meant the airport had to adapt to new needs, and in 1954 construction began on a new terminal, known as the National Terminal, complemented by a cargo terminal and parking stands for cargo aircraft.

In 1965 the airport was renamed Madrid–Barajas Airport, and in the 1970s traffic exceeded four million passengers a year, so in 1971 construction began on a new passenger terminal exclusively for international traffic, known as Terminal T-1.

In 2000, to increase the airport's capacity to 70 million passengers a year, the so-called Barajas Plan was launched to expand the airport. It culminated on 4 February 2006 with the opening of a new terminal area, which included the current T4 and its satellite building, T4S, equipped with the most modern resources for this type of facility (automated passenger transport and automated baggage handling systems, new runways and taxiway systems, aprons, control tower, car parks, road systems, and auxiliary and complementary services).

As we have seen, the airport's transformation since its beginnings has been continuous, driven by the growth in passengers, with interesting technical aspects inherent in building the various expansions. This event therefore aims to have those involved, true experts in the field, explain – at least in part – the processes behind its development.

This latest expansion was a real challenge, and although for the general public the most visible part of the Plan may have been the terminal buildings, the other works were in fact of greater importance from an aeronautical point of view, not forgetting the human aspects of managing people and baggage. The speakers, key players in this colossal undertaking, will describe the heroic human efforts they had to make, only possible thanks to their excellent knowledge and enthusiasm.

The high level of professionalism of the human and technical teams of the companies involved in the construction made it possible to follow AENA's guidelines accurately and achieve effective collaboration and coordination in every aspect of the works, without which it would have been very difficult to tackle their complexity.

The airport land was originally open moorland, but progress, not always well directed, led to the whole surrounding area becoming filled with buildings, with the resulting difficulty of resolving issues of noise pollution, road links, compulsory purchases and so on, all painstakingly resolved by AENA.

The human and technical worth of those involved, the speakers at this event, has given rise to one of the best airports in the world. The Instituto de la Ingeniería de España expresses its recognition of this work of Spanish engineering and thanks the speakers for their collaboration in holding this event.

Our newsletter

Get up-to-date information in your inbox

A short summary of new resources and the latest news from our editorial team

ISP Integration newsletter on a tablet